BIM

Building Information Modelling

Transforming the design, review, and construction process

BAF utilises Building Information Modelling (BIM) up to 4D. We use BIM in industrial refrigeration projects throughout numerous sectors. This has transformed the design, review, and construction process. BIM allows for a comprehensive and collaborative approach to project management, enabling seamless coordination between various stakeholders and disciplines involved in the projects. In our approach, we start by creating a detailed digital model of the BAF scope of works, including the refrigeration systems, architectural/structural elements, HVAC systems, electrical layouts, and other critical components. This digital model serves as a centralized hub of information that all project team members can access and contribute to throughout the project lifecycle.

Overall, our use of BIM in industrial refrigeration projects throughout numerous sectors has resulted in improved collaboration, enhanced project efficiency, and better outcomes for our clients. By leveraging the power of BIM, we can deliver high-quality, compliant, and sustainable solutions that meet the complex needs of the pharmaceutical industry.

Minimising costly rework and delays during the construction phase.

During the design phase, BIM facilitates early clash detection, allowing us to identify and resolve any conflicts between different vendors before construction begins. This proactive approach minimizes costly rework and delays during the construction phase. Additionally, BAF can use the BIM model to carry out CFD Analysis, to map the temperature and air velocities before construction.

Throughout the construction phase, BIM serves as a valuable tool for project coordination and communication. Contractors can access the digital model to understand the sequencing of construction activities and ensure that all installations align with the design intent. Any changes or updates made during construction are reflected within the digital model, ensuring we all are working from the most up-to-date information.

Software & Packages

The list of software’s and packages BAF use to utilise BIM are:

  • Autodesk Revit – this is used to Generate 3D models of the complex refrigeration system along with the Architectural envelopes of our cold rooms, Freezers, and modular skids.
  • Autodesk AutoCAD – 2D & 3D – this is used to Generate 2D general arrangement drawings and P&ID’s (Piping and Instrumentation Diagram)
  • Autodesk Navisworks – this is used to visualise the 3D model generated in Revit, along with viewing the BAF scope of works within the overall project. Clash detection and coordination is usually captured in Navisworks.
  • BIM 360 – this is a cloud base management platform.
  • ACC – Autodesk Construction Cloud – ACC is a cloud-based platform, this is used to share and coordinate 3D models.
  • Revizto – This is a cloud-based clash detection software.